The work of this project included, but not limited to, the following: •Facility-wide SCADA system upgrades, including construction of a new SCADA control room, SCADA servers, ethernet switches, firewall hardware, and workstations; • Install facility-wide HVAC system upgrades; • Install facility-wide fire protection system upgrades; • Install filter control valves and finished water pump control Continue Reading
Construction of a new WTP for Wells 2, 3, and 4 for the removal of iron, manganese, and polyfluoroalkyl substances (PFAS). The proposed project included an approximately 7,500 square foot single-story (with below grade pipe gallery and water tanks) pre-engineered metal building (approximately 50 foot wide by 150 foot long), two stormwater infiltration basins, an Continue Reading
Construction of a 1.44-million gallons per day (MGD) WTP to provide treatment for the removal of iron, manganese and PFAS from the town’s existing groundwater wells 5 & 8. The project consisted of constructing a new 134’ x 52’ masonry water treatment facility, a new gravel and asphalt driveway to access the treatment facility, and Continue Reading
The scope of work included construction of a new 9,500 square foot masonry water treatment facility designed for iron, manganese, and PFAS removal located in Middleborough, MA. The scope of work also included construction of a new 4,500 square foot vehicle storage facility, demolition of existing underground water treatment infrastructure, existing garage, and exterior rehabilitation Continue Reading
Construction of the Central Acton Water Treatment Plant PFAS Treatment Upgrade in Acton, MA, at the existing Central Acton Water Treatment Plant site. The project included construction of a new PFAS treatment building including the installation of a granular activated carbon (GAC) pressure vessel system and variable frequency drives (VFDs) procured under a separate contract, Continue Reading
Construction of a 2.16 MGD PFAS Water Treatment Plant (WTP) building and appurtenant systems, including four (4) Granular Activated carbon filter vessels. The PFAS WTP is a 3,872 square foot masonry building that contains filtration system equipment, process piping, a pumping equipment system and electrical systems. Work is inclusive of civil site, process, HVAC, plumbing, Continue Reading
Our RPR is overseeing the construction and installation of new electrical components for the following: Tunnel Pump Station, Control Building, Grit/Screening Facility, Odor Control Facility, Head Tank, Valve Vault, 54-inch Force Main to HWPCF. The work is a part of the CSO wet weather storage in a previously installed 4 ½ mile tunnel boring project Continue Reading
Our Resident Project Representative provided observational services for 8-inch water main and service connections. Temporary bypass was installed for 3500lf with all above ground connections to properties and maintain during construction. The project included correcting/repairing numerous drainage cross connections and DMH. Work also included relocating various sewer manholes and sewer SDR pipe alignment. Upon completion Continue Reading
Resident project representative responsible for the oversight of a CIPP (Cast In Place Pipe) lining job with approximately;15,000 of CCTV and Main Line Cleaning, 5,000’ of lateral CCTV and Cleaning, 15,000’ of main sewer segment lining, 5000’ of sewer lateral lining (from building to sewer main), 15 spots of pipe point repair ( excavate and Continue Reading
Construction of a new building housing GAC filter vessels for PFAS removal, a new submersible well pump and associated piping and appurtenances, a new above ground water storage tank, a new building housing backwash supply pump, site piping, and modifications inside the existing water treatment plant. Project will also include masonry, ornamental and miscellaneous iron, Continue Reading