Close

Quittacus WTP Phase 2 Upgrades – New Bedford, MA

The work of this project included, but not limited to, the following: •Facility-wide SCADA system upgrades, including construction of a new SCADA control room, SCADA servers, ethernet switches, firewall hardware, and workstations; • Install facility-wide HVAC system upgrades; • Install facility-wide fire protection system upgrades; • Install filter control valves and finished water pump control Continue Reading

Middleborough Water Treatment Facility – Middleborough, MA

The scope of work included construction of a new 9,500 square foot masonry water treatment facility designed for iron, manganese, and PFAS removal located in Middleborough, MA. The scope of work also included construction of a new 4,500 square foot vehicle storage facility, demolition of existing underground water treatment infrastructure, existing garage, and exterior rehabilitation Continue Reading

Central Acton Water Treatment Plant PFAS Treatment Upgrade – Acton, MA

Construction of the Central Acton Water Treatment Plant PFAS Treatment Upgrade in Acton, MA, at the existing Central Acton Water Treatment Plant site. The project included construction of a new PFAS treatment building including the installation of a granular activated carbon (GAC) pressure vessel system and variable frequency drives (VFDs) procured under a separate contract, Continue Reading

Chestnut Street PFAS Water Treatment Plant – Foxborough, MA

Construction of a 2.16 MGD PFAS Water Treatment Plant (WTP) building and appurtenant systems, including four (4) Granular Activated carbon filter vessels. The PFAS WTP is a 3,872 square foot masonry building that contains filtration system equipment, process piping, a pumping equipment system and electrical systems. Work is inclusive of civil site, process, HVAC, plumbing, Continue Reading

Phinney’s Ln./Rte. 28 Water Main Upgrade – Barnstable, MA

Our Resident Project Representative provided observational services for 8-inch water main and service connections. Temporary bypass was installed for 3500lf with all above ground connections to properties and maintain during construction. The project included correcting/repairing numerous drainage cross connections and DMH. Work also included relocating various sewer manholes and sewer SDR pipe alignment. Upon completion Continue Reading

Hannigan Treatment Plant Upgrades – Abington, MA

Construction of a new building housing GAC filter vessels for PFAS removal, a new submersible well pump and associated piping and appurtenances, a new above ground water storage tank, a new building housing backwash supply pump, site piping, and modifications inside the existing water treatment plant. Project will also include masonry, ornamental and miscellaneous iron, Continue Reading