Wastewater Collection and Water Resource Recovery Facilities Phase 1 – Contract No. 2 – Dennis, MA

The work of this contract includes, but is not limited to, installing approximately 22,300 linear feet of 8-inch to 30-inch polyvinyl chloride (PVC) gravity sewer pipe; 7,500 linear feet of 2-inch to 3-inch SDR-11 high density polyethylene (HDPE) low pressure sewer pipe; 30,300 linear feet of 4-inch to 14-inch HDPE force main; 3 submersible pumping stations; 1 suction lift pumping station; including manholes, sewer service connections and appurtenances; earthwork; dewatering and drainage; paving; restoration; and all miscellaneous work and cleanup as specified.