Our chief resident project representative is overseeing a significant electrical upgrade and instrumentation control for aeration tanks and various improvements. Aeration tank upgrades included new instrumentation devices for D.O. control with all local control panels, PLC’s, and existing SCADA screen connections. Building improvements to the exterior included reroofing several buildings including masonry repointing repairs, metal Continue Reading
Assisted in overseeing concrete encased duct banks for electrical/telemetry/security, water and onsite septic. Intimately involved with concrete rebar drawings for foundation footing and wall/slab placement. Oversaw the construction of a 200’ water tank foundation, steel tank coatings/paints. Project included sandblasting and coating a new tank with a two-part epoxy coating on the interior and exterior Continue Reading
Our Resident Project Representative provided observational services for installing 12” SDR 35 sewer main sewer pump station upgrades. A temporary bypass was installed with all above ground connections to pump station and maintain full service during construction. The project included upgrading/modifying the wet well, dry well and control room. Work also included relocating transformers, replacing Continue Reading
Replacement of 6100lf of 12″ water main in Hartford Hospital area with domestic and fire services. Restoration work associated with the work.
Installation of 8″ & 12″ PVC water main along with gate valves and boxes.
Installation of new 20" & 24" PVC sewer force main with associated manholes, valves and appurtenances.
The Fairhaven Wastewater Treatment Facility (WWTF) is an oxygen activated sludge secondary treatment plant. The project FWWTF Contract #2 Solids Processing Upgrade consists of process upgrades to the thickening, dewatering, sludge storage and odor control systems of the solids processing facilities. Our Chief Observer is currently overseeing the blasting, dewatering, and excavation/shoring of a new Continue Reading
Resident project representative that oversaw phases of new construction for a pump station. The job included observation of all structural components during construction as well as performance testing of mechanical assemblies, HVAC systems, pumps, equipment, electrical components, pipe installations, grading and civil plans. Check-In 1 Check-In 2
