The work of this project included, but not limited to, the following: •Facility-wide SCADA system upgrades, including construction of a new SCADA control room, SCADA servers, ethernet switches, firewall hardware, and workstations; • Install facility-wide HVAC system upgrades; • Install facility-wide fire protection system upgrades; • Install filter control valves and finished water pump control Continue Reading
Construction of a new WTP for Wells 2, 3, and 4 for the removal of iron, manganese, and polyfluoroalkyl substances (PFAS). The proposed project included an approximately 7,500 square foot single-story (with below grade pipe gallery and water tanks) pre-engineered metal building (approximately 50 foot wide by 150 foot long), two stormwater infiltration basins, an Continue Reading
Construction of a 1.44-million gallons per day (MGD) WTP to provide treatment for the removal of iron, manganese and PFAS from the town’s existing groundwater wells 5 & 8. The project consisted of constructing a new 134’ x 52’ masonry water treatment facility, a new gravel and asphalt driveway to access the treatment facility, and Continue Reading
The scope of work included construction of a new 9,500 square foot masonry water treatment facility designed for iron, manganese, and PFAS removal located in Middleborough, MA. The scope of work also included construction of a new 4,500 square foot vehicle storage facility, demolition of existing underground water treatment infrastructure, existing garage, and exterior rehabilitation Continue Reading
Construction of the Central Acton Water Treatment Plant PFAS Treatment Upgrade in Acton, MA, at the existing Central Acton Water Treatment Plant site. The project included construction of a new PFAS treatment building including the installation of a granular activated carbon (GAC) pressure vessel system and variable frequency drives (VFDs) procured under a separate contract, Continue Reading