Close

Wastewater Collection and Water Resource Recovery Facilities Phase 1 – Contract No. 2 – Dennis, MA

The work of this contract includes, but is not limited to, installing approximately 22,300 linear feet of 8-inch to 30-inch polyvinyl chloride (PVC) gravity sewer pipe; 7,500 linear feet of 2-inch to 3-inch SDR-11 high density polyethylene (HDPE) low pressure sewer pipe; 30,300 linear feet of 4-inch to 14-inch HDPE force main; 3 submersible pumping Continue Reading

Nitrogen Removal and Headworks Upgrade – Barnstable, MA

This project includes demolition of the existing pretreatment building and equipment and construction of new headworks, septage receiving, and fine screening facilities. Improvements include new screening and grit removal systems, flow measurement, odor control, and equipment required to support the membrane bioreactor (MBR) process. The project converts three existing aeration tanks from an MLE process Continue Reading

NBC Bucklin Point WWTF – Final Clarifier, UV Disinfection System & Miscellaneous Improvements – Providence, RI

This project is comprised of the installation of two final clarifiers, a return sludge pump station, an ultraviolet disinfection facility, modifications to the influent pump station and yard piping, and appurtenances as indicated on the drawings and as specified herein. The Bucklin Point WWTF is to remain in operation during the construction period. Additional work Continue Reading

East Street WTP PFAS Treatment – Sudbury, MA

New PFAS Water Treatment Facility for the Town of Sudbury, MA. The Facility will remove PFAS compounds from the wells located nearby Wellfield site after going through an existing greens and filtration treatment system. The building is a steel-framed structure with concrete slab on grade floors. The building enclosure consists of an insulated standing seam Continue Reading

Pine Valley Plantation Water Distribution and Roadway Improvements – Belchertown, MA

The installation, disinfection, and testing of approximately 19,000 linear feet of 4-inch polyvinyl chloride water main and the removal and/or abandonment of existing water mains, including new water service connections and curb stops, installation of gate valves and fittings, new hydrants, pipe restraint, and appurtenances. The proper disposal of removed water main and associated appurtenances. Continue Reading