Our chief resident project representative is overseeing a significant electrical upgrade and instrumentation control for aeration tanks and various improvements. Aeration tank upgrades included new instrumentation devices for D.O. control with all local control panels, PLC’s, and existing SCADA screen connections. Building improvements to the exterior included reroofing several buildings including masonry repointing repairs, metal trim, flashing, and eave repair.