Resident project representative responsible for the oversight of a CIPP (Cast In Place Pipe) lining job with approximately;15,000 of CCTV and Main Line Cleaning, 5,000’ of lateral CCTV and Cleaning, 15,000’ of main sewer segment lining, 5000’ of sewer lateral lining (from building to sewer main), 15 spots of pipe point repair ( excavate and replace damaged pipe as needed), 20-30 spots of Lateral repair at the main line, 8 new pre-cast manholes and 4 new doghouse manholes.