The work of this project included, but not limited to, the following: •Facility-wide SCADA system upgrades, including construction of a new SCADA control room, SCADA servers, ethernet switches, firewall hardware, and workstations; • Install facility-wide HVAC system upgrades; • Install facility-wide fire protection system upgrades; • Install filter control valves and finished water pump control valves; • Install various pretreatment system upgrades, including chain and flights and sedimentation basin upgrades, process drain pump system, raw water mixer; telescopic sludge valves; mud valves; alum piping and other appurtenances; and • Install various administration and bathroom upgrades.